To accomplish this, the bridge was engineered to accommodate the normal expansion and contraction of concrete due to factors including temperature and weather changes, vehicular weight and movement. The Hoover Dam Bypass is designed and constructed to last for more than 100 years. At 840 ft above the Colorado River, it is the second-highest bridge in the country and the longest arched concrete bridge in the Western Hemisphere. Today the four-lane bridge is the first concrete-steel composite arch bridge built in the U.S. The bridge would provide an improved, safer (less windy), shorter route between Las Vegas and Phoenix and provide additional security for the Hoover Dam against attacks. Later, Watson Bowman Acme, a BASF company, provided Jeene expansion joint systems and slider plate assemblies, adding corrosion and structural protection, while accommodating thermal and seismic movements, vehicle impact and structural loads.ħ5 years later, construction began on the Mike O'Callaghan – Pat Tillman Memorial Bridge. To make the concrete durable, strong and increasing its overall performance, the engineers specified a new innovation in concrete admixtures: Pozzolith water-reducing admixtures, invented in 1932 by Master Builders, now a BASF brand. Towering 726 ft above the Colorado River, it is 1,244 ft across at the top, 660 ft thick at the base and 45 ft thick at the top and weighs in at whopping 6.6 millions tons. To this day, it remains the highest dam in the Western Hemisphere. In fact, even with this design, the dam would need to resist the water pressure more than 45,000 lb per square foot at the base of the dam.īy its completion in 1935, the Hoover Dam was the greatest concrete project ever recorded, using more masonry than the Great Pyramid at Giza (4.5 million cu yd) and equal to the amount needed to build a two-lane highway from Seattle to Miami, or a 4-ft-wide sidewalk around the Equator. It would take a lot of concrete to make this work. The resulting concrete arch-gravity design, allowing the water load to be dispersed by both the gravity and horizontal arch action, was the winning solution. They stand out as monuments of determination and exemplify how technology and chemistry contribute to engineering success.īefore the Hoover Dam transformed the raging, flood-prone Colorado River into a resource for economic growth, it took a team of 200 engineers to achieve what many thought was impossible: design a dam that could hold back a 500-ft-deep, 10-trillion-gal reservoir enough water to cover the state of Connecticut 10 ft deep. However, these public works share more than the Colorado River. The Hoover Dam, and the newly constructed Hoover Bypass, or Mike O'Callaghan – Pat Tillman Memorial Bridge, are engineering marvels that embody American ingenuity, grit and power. The Engineering Behind the Hoover Dam and Its Bypass
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
December 2022
Categories |